The Wiki is still in development, please bare with us while we add and update content.

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Last revision Both sides next revision
schedman:main [2017/08/27 09:16]
textstorm [SchedMan Screens]
schedman:main [2017/08/27 09:27]
textstorm
Line 77: Line 77:
 ===== SchedMan Screens ===== ===== SchedMan Screens =====
  
-There are 5 screens available on SchedMan to help you monitor, manage and create your schedules.+There are 5 screens available on SchedMan to help you monitor, manage and create your jobs. 
 + 
 +==== Basic ====
  
-  * **Basic** 
 The Basic screen provides, as the name suggests, a basic view of all schedules with their description and last/next run times. The Basic screen provides, as the name suggests, a basic view of all schedules with their description and last/next run times.
  
 {{:​schedman:​basic.png?​100|}} {{:​schedman:​basic.png?​100|}}
-  * **Advanced** + 
-The Advanced screen provides more information on your schedules, such as whether the job is currently running or has returned an error. If you have configured the script to do so, it will also show you how many rows your job affected the last time it run.+---- 
 + 
 +==== Advanced ​==== 
 + 
 +The Advanced screen provides more information on your jobs, such as whether the job is currently running or has returned an error. If you have configured the script to do so, it will also show you how many rows your job affected the last time it run.
  
 {{:​schedman:​advanced.png?​100|}} {{:​schedman:​advanced.png?​100|}}
-  * **Modify**+ 
 +---- 
 + 
 +==== Modify ​==== 
 The Modify screen lets you change the configuration and details of your jobs. The Modify screen lets you change the configuration and details of your jobs.
  
 {{:​schedman:​modifyhighlight.png?​100|}} {{:​schedman:​modifyhighlight.png?​100|}}
-  * **Advanced Runtime Options**+ 
 +---- 
 + 
 +=== Advanced Runtime Options ​=== 
 The Advanced Runtime Options screen is accessible through the Modify screen, please see the red box which highlights it in the Modify screen image above. The Advanced Runtime Options screen is accessible through the Modify screen, please see the red box which highlights it in the Modify screen image above.
  
 This page allows you to configure an advanced run matrix, where you can specify particular times and days to run the job, for example - Friday betweeen 02:00 and 03:00 This page allows you to configure an advanced run matrix, where you can specify particular times and days to run the job, for example - Friday betweeen 02:00 and 03:00
-  * **Create** 
-  * **Logs** 
  
 +The day matrix has seven 1's defined by default, representing days of the week from Monday to Sunday, if you only wanted your job to run on a Friday the matrix would be: 0000100
 +
 +{{:​schedman:​advancedmatrix.png?​100|}}
 +
 +----
 +
 +==== Create ====
 +
 +The Create screen allows you to add a new job to SchedMan.
 +
 +{{:​schedman:​create.png?​100|}}
 +
 +----
 +
 +==== Logs ====
 +
 +The Logs screen shows you the logs generated by SchedMan and your jobs, if you have enabled logging in the installation phase and configured your jobs to do so.
 +
 +SchedMan logging:
 +
 +{{:​schedman:​logs.png?​100|}}
 +
 +SchedMan and job logging:
 +
 +{{:​schedman:​logswithjob.png?​100|}}
 +
 +SchedMan and job logging when Advanced Runtime Options are enabled:
 +
 +{{:​schedman:​logswithjobmatrix.png?​100|}}
 ===== Schedule Example ===== ===== Schedule Example =====
  

QR Code
QR Code schedman:main (generated for current page)